The fire costs more than the box
A hall, a fleet, a night without a shift: lithium-ion packs do not wait for the fire service. €4,500 net is a decision — not a letter of hope to the insurer.
Online shop
The Li-Ion Safety Box M fire protection box: charge, monitor, isolate, suppress. Four interior sockets, 12 litres of TRIDENT, max. 3.6 kWh, IP54. List price €4,500 excl. VAT — for operations that will not wait to do the maths after the hall is gone.








RUK Li-Ion Safety Box M
List price
€4,500.00
excl. VAT · €5,355.00 incl. 19% VAT
Shipping and freight not included — delivery date with the order confirmation.
Prefer 30 minutes first?Why buy
A hall, a fleet, a night without a shift: lithium-ion packs do not wait for the fire service. €4,500 net is a decision — not a letter of hope to the insurer.
Temperature monitoring, shutdown, 12 litres of TRIDENT, ten-year shelf life. Not a passive safe that lets the chemistry run.
Four interior sockets. The cable stays in the monitored volume — not under the bench, not in the corridor.
Max. 3.6 kWh, IP54, 600 × 600 × 450 mm. Purchasing, fire safety and the shift lead can say the same sentence.
Independent test principle M 02-2022 on fire and explosion behaviour. Reports and original videos are on the product page.
Second hall, additional depot or rental fleet: the charging point can be set up identically at every site — same operation, same instruction, same documentation.
You order directly from the manufacturer: order here, talk to us, written order confirmation — as stated in our terms.
Do the maths
The calculation puts the sum that accumulates at a single charging point next to the purchase price. The figures below are example values – replace them with your own.
Four internal sockets and max. 3.6 kWh per box – that determines how many boxes your charging point needs.
Sum at the charging point
€910,000
Purchase
€13,500
3 × RUK Li-Ion Safety Box M, net
The sum at the charging point is around 67 times the purchase price.
This is what the box works against: fully closed, the event stays inside the housing. The test basis is TÜV NORD test principle M 02-2022. Statutory fire protection requirements are not replaced.
All figures are your own assumptions. This comparison is neither a loss forecast nor insurance advice: whether a fire occurs, and how costly it would be, cannot be predicted. For the risk assessment, talk to your fire safety officer and your insurer.
Included
At a glance
Then let us clear it up first: read the FAQ or talk with us for 30 minutes before you order.
Calendar
Thirty minutes, phone or video. Free times are in the calendar. Confirmation by email to you and to us.
These are the open slots for next week. If none of them suits you, just note it in the message field and we will suggest an alternative.
Loading slots …
How would you like to talk?
Net, excl. VAT
+ 19% VAT
Gross, incl. VAT
plus shipping / freight
B2B order at list price. The contract is formed with our written confirmation.
Fields marked * are required.